Collaboration, work enquires or just say helloholasalut你好もしもし안녕하세요
Missisauga
+1 (905) 581-1703
refurb@foliointeriors.com
Find Us
170 Ambassador Dr, Unit 3,
Mississauga, ON L5T 2H9
Missisauga
+1 (905) 581-1703
refurb@foliointeriors.com
Find Us
170 Ambassador Dr, Unit 3,
Mississauga, ON L5T 2H9

Lobby refurbishments for condominiums in Kitchener and across Waterloo Region. We bring our design-build team to your building and stage the work so the entrance stays open.
Planning lobby work in Kitchener? Send us the details and we will arrange a site visit.
Kitchener's newer towers near the ION line and the downtown innovation district were built with modern lobbies, but many are already wearing under heavy move-in traffic and rising parcel volumes. Older condominiums near Fairview Park, Forest Heights and Highland Road have lobbies that have barely changed in decades, with dated lighting, worn flooring and furniture that no longer suits the building.
Folio Interiors serves Kitchener boards that want one accountable firm for design and construction. We assess the lobby, recommend finishes and furniture, prepare a clear price with options and manage installation with a supervisor on site every working day.
Kitchener is outside our core GTA area, so travel and deliveries are planned into the schedule from the start. See our main condo lobby refurbishment service page, or our corridor refurbishment in Kitchener if the hallways also need work.

Most Kitchener lobby projects draw on a few of the scopes below. We size the work to what your entrance actually needs, so the budget goes where residents and visitors will notice it.
The entrance floor takes more abuse than any other surface in the building. We balance appearance with slip resistance, durability and how easily a damaged tile or plank can be replaced.
A lobby needs one strong focal point and calm surroundings. We pair a feature wall with refreshed ceilings and lighting that is bright at the desk and warm in the lounge. Read more in our article on common area lighting retrofits.
We design concierge desks around how staff actually work, select seating that meets flammability requirements for public spaces, and plan parcel storage so the lobby stays clear. Our article on concierge desk design explains the details.
Where something is still in good condition, we say so. Keeping sound millwork, stone or fixtures and spending where wear is worst is often the smartest way to get a lobby that feels completely new.
Furniture and custom millwork usually have the longest lead times in a lobby project, so we finalize selections early and order as soon as the board approves. That keeps the lobby from sitting empty while pieces are on their way.

The table below summarises the decisions most Kitchener boards make. Each choice is reviewed for safety, maintenance and long-term cost before anything is ordered.
| Area | Common options | What to weigh |
|---|---|---|
| Floor | Large-format porcelain, LVT, recessed entrance mats | Wet-floor safety, grit and salt, maintenance routine, spare stock |
| Walls | Feature panels, wallcovering, millwork, paint | Durability at corners, focal point, sound absorption, cost over time |
| Ceiling | Drywall bulkheads, coves, coffers, acoustic panels | Height, sprinklers and detectors, access to services, light reflection |
| Lighting | Statement fixture, LED coves, wall sconces | Energy use, glare, warm versus cool light, emergency lighting requirements |
| Furniture and desk | Contract seating, millwork desk, parcel lockers | Fire safety of upholstery, staff workflow, delivery volumes, accessibility |
If several of these apply, a site review is a sensible next step. We can separate urgent items from those that can wait and group them into a scope the board can approve.
We also review how easily people with mobility devices, strollers or luggage move through the space. Automatic doors, flush transitions between flooring types and a clear path to the elevators often cost little when included in the main project.
A lobby project happens in the busiest room in the building, and we plan for that from day one. Work moves zone by zone, with a clear path to the doors, mailroom and elevators at all times.
A short pre-construction meeting sets out access, notices and the temporary concierge station. Residents receive the same plan, so they know what will change at the entrance and when.
Residents also get a simple way to raise concerns. Questions go to the site supervisor, who responds quickly and keeps management informed, so small issues are solved the same day.

Each stage ends with something your board can review and approve, so decisions are made in order and nothing is rushed.
We inspect the ground floor and document existing conditions and problem areas.
Finish selections, furniture, lighting layouts and renderings for board review.
A clear scope with options and a schedule tied to your funding.
Zoned construction with protection, dust control and a single supervisor.
Walkthrough, sign-off and spare tiles, fabric and paint stored for the building.
No two lobbies price the same, because size, furniture and existing conditions vary. Our articles on common element refurbishment costs, reserve fund planning and the refurbishment timeline explain what drives the numbers.
We price lobby work in clear line items, so the board can see what flooring, walls, lighting, furniture and the desk each cost, and decide what to do now and what to plan for later.
Send us the building address and a few photos of the entrance and lobby. We will walk the space with you, explain the options and give your board a clear plan and budget.
Call +1 (905) 581-1703 or email refurb@foliointeriors.com
Gathering the following before the first meeting speeds up pricing and avoids a second visit.
With this, we can usually return a scope and a budget range quickly, then refine it after a walkthrough. Our cost guide for common elements shows how boards sequence lobby, corridor and amenity work.
Most residents never read the specification, but they notice the result: an entrance that is bright, organised and welcoming from the doors to the elevators.
Boards notice that the space is easier to maintain. Hard-wearing finishes resist salt and scuffs, repairs blend in, and the lobby holds its appearance for years. That consistency supports property values across Kitchener.
Lobbies work best when they connect to the rest of the building. See our guides to elevator cab and lobby refurbishment and accessibility in condo common areas for ideas on extending the upgrade.
In downtown towers, the priorities are durability and parcel handling. Lobbies in buildings with many rental suites see constant move-ins, so we specify tough flooring, wall protection at the doors and elevators, and furniture with cleanable upholstery. A parcel room or lockers keeps deliveries organised and off the floor.
Older lobbies in established neighbourhoods usually need a fuller refresh: new lighting, lighter wall finishes, updated flooring and furniture arranged to make the space feel open and welcoming. Where existing stone or millwork is sound, we design around it. Our condo lobby refurbishment guide covers the planning in more detail.
Because we travel to Kitchener, we plan the job to keep it moving. Furniture and millwork are ordered early, materials arrive in planned batches, and site meetings are grouped so the board sees progress at each one. The supervisor stays with the project from start to finish, just as on our GTA work.
Waterloo Region winters are hard on entrances. We specify slip-resistant flooring and recessed walk-off matting at the doors, along with finishes that stand up to salt, so the lobby stays safe and looks good after every season.
Many Kitchener boards pair lobby work with corridor refurbishments, amenity refurbishments or furniture, fixtures and equipment. One design-build team keeps the look consistent.

We take on lobby projects throughout Kitchener and can also support buildings in Waterloo and Cambridge.
Not sure whether your building is in our area? Ask us. We travel between projects across the region, and a first walkthrough can often be paired with a nearby visit.
Yes. We work in Kitchener and Waterloo Region, and we build travel, deliveries and supervision into the schedule from the start.
We stage the project in zones, keep a clear route to the doors, elevators and mailroom, and set up a temporary concierge or pickup point if needed.
Usually durable flooring, wall protection, cleanable furniture and a proper parcel solution to handle frequent move-ins and deliveries.
Yes. New lighting, lighter finishes, updated flooring and new furniture can transform an older lobby while keeping sound stone or millwork.
We gather measurements, photos and notes in one well-planned visit and group later meetings so the project moves without repeat trips.
Yes. Many boards combine lobby work with corridors or amenity spaces so the whole building shares one design.
Yes. Call +1 (905) 581-1703 or email refurb@foliointeriors.com to discuss your building.
Pricing depends on the size of the lobby, the finishes and furniture chosen, the concierge desk and the condition of existing floors, walls and ceilings. We price from a site review and give options so the scope fits your reserve fund.
Many lobby projects take a few weeks to a few months on site, plus design and ordering time beforehand. Custom furniture and desk millwork usually set the schedule, so we order them early. The board receives a written schedule before work starts.
Furniture and finishes in common areas must suit a public, exit-route space. We select contract-grade products with appropriate flammability testing and confirm requirements with your consultant. Our guide to fire-rated furniture in Ontario explains more.
Yes. As a design-build firm we handle finish and furniture selection, lighting design, renderings, pricing and construction with one team, which avoids gaps between designer and contractor.
Adding {{itemName}} to cart
Added {{itemName}} to cart