Collaboration, work enquires or just say helloholasalut你好もしもし안녕하세요
Missisauga
+1 (905) 581-1703
refurb@foliointeriors.com
Find Us
170 Ambassador Dr, Unit 3,
Mississauga, ON L5T 2H9
Missisauga
+1 (905) 581-1703
refurb@foliointeriors.com
Find Us
170 Ambassador Dr, Unit 3,
Mississauga, ON L5T 2H9

Lobby refurbishments for Vaughan condominiums, from new towers at the Vaughan Metropolitan Centre to established buildings in Thornhill, Woodbridge and Maple. We design, price and build the work while the entrance stays open.
Tell us about your Vaughan building and we will reply to arrange a lobby review.
Vaughan's condominium lobbies span several generations. Thornhill buildings along Bathurst Street, Clark Avenue and Steeles Avenue often date from the 1980s and 1990s, Woodbridge and Maple have added mid-rise buildings, and the Vaughan Metropolitan Centre has become a cluster of new towers with busy, modern lobbies. Each needs a different approach.
We know Vaughan lobbies first-hand. At Park Terrace II on Townsgate Drive in Thornhill, the lobby features a coffered ceiling, a crystal chandelier, dark panelled walls, abstract gold artwork and soft grey lounge seating. The same team handles every step of a Vaughan project, from design to the final walkthrough.
For other York Region locations, see our main condo lobby refurbishment service page, or our corridor refurbishment in Vaughan for hallway work.

A lobby refresh in Vaughan does not have to mean gutting the space. We review each element separately and recommend the mix that gives the strongest first impression for the budget.
Porcelain tile, luxury vinyl or stone-look surfaces are chosen for slip resistance, winter salt and the cleaning routine, with recessed walk-off matting at the doors to keep grit out of the rest of the building.
We choose wall finishes that stand up to deliveries and luggage, then layer the lighting so the lobby looks welcoming by day and night. For background, see our guide to common area lighting retrofits.
Desk millwork, lounge seating, artwork and parcel storage are planned together, so the lobby works for staff, residents and couriers. For more, read our guide to concierge desk design.
Not every lobby needs all of this. Some boards replace the floor and lighting and keep a good concierge desk; others focus on furniture and a feature wall. We explain the trade-offs so the scope reflects how the space is really used.
Because contract furniture and desk millwork can take several weeks to produce, we lock in those selections first and schedule construction around their delivery, so the finished space comes together at once.

The lobby is part of the building's exit route and a public-facing space, so finishes and furniture must meet fire safety requirements. We confirm product data with your consultant before ordering.
| Area | Common options | What to weigh |
|---|---|---|
| Floor | Porcelain tile, stone-look tile, luxury vinyl, walk-off matting | Slip resistance, winter salt, cleaning equipment, replacing damaged tiles |
| Walls | Stone-look porcelain, wood slats, textured wallcovering, paint | Impact from deliveries, feature wall location, acoustics, repairs |
| Lighting | Chandeliers or pendants, cove lighting, sconces, downlights | Light level at the desk, colour temperature, dimming, reaching fixtures for maintenance |
| Concierge desk | Custom millwork with quartz or stone top | Sightlines to doors and elevators, security screens, an accessible counter height |
| Furniture | Contract-grade lounge seating, tables, rugs | Flammability requirements, durability, cleanability, layout for traffic flow |
Spotting two or three of these is usually enough to start planning. A walkthrough helps us separate cosmetic wear from items that should be replaced.
Good lighting and contrast help residents with low vision, while sturdy seating with arms helps older residents rest while they wait. We build these details into the design so they look intentional, not like an afterthought.
Lobby work should not feel like a construction site. We split the job into stages, keep the entrance, elevators and mailroom accessible, and hand each area back clean before moving on.
Before mobilizing, we meet the property manager and board to agree on working hours, the temporary concierge setup and how deliveries will be handled. The plan is shared with residents in advance.
We also plan for the unexpected. If a resident needs assistance getting in or out, or a large delivery is booked, the supervisor adjusts the day's work so access is never a problem.

Our five-step process keeps Vaughan boards in control: you approve each stage before the next one starts.
We review the entrance, lobby, mailroom and concierge area, measure and photograph existing conditions.
Finish boards, furniture selections, lighting plans and 3D renderings show the finished lobby before approval.
A written scope and price with options, sized to your reserve fund.
Construction in zones with a temporary concierge, protection and daily cleaning.
A joint walkthrough, closed deficiency list and labelled spare materials.
For planning, our guides to common element refurbishment costs, reserve fund planning and the refurbishment timeline show how boards set budgets and schedules before requesting quotes.
Most boards fund lobby work from the reserve fund, so we tie each option to a clear price and timeline. If the full scope does not fit this year, we split it into stages that each leave the lobby looking finished.
Tell us about your building and share a few photos. We will arrange a site review, outline the choices and return a scope your board can act on.
Call +1 (905) 581-1703 or email refurb@foliointeriors.com
A few facts help us return a useful scope quickly. Rough numbers are fine; we confirm the details on site.
From there we prepare a first scope and ranged budget, then confirm quantities on site. Our cost guide for common elements explains how buildings phase common-area work.
The lobby is the first and last thing residents see every day. After a refurbishment it feels brighter, calmer and more secure, and residents are proud to welcome guests.
Staff notice the difference too: a desk that fits the way they work, a parcel system that keeps deliveries organised and finishes that are easy to clean. Buyers and tenants form their impression of the whole building here, so a fresh lobby supports resale and rental value.
The same design can continue upstairs. Our guides to elevator cab and lobby refurbishment and accessibility in condo common areas show how to carry the look and accessibility improvements beyond the ground floor.
Older Thornhill lobbies often have formal layouts, dark finishes and dated lighting. A refined update, with a feature ceiling, a statement fixture, lighter walls and comfortable modern seating, can give them a new life, as at Park Terrace II. Newer VMC towers have modern lobbies but very heavy traffic, so durable flooring, wall protection and a proper parcel room matter more than a redesign.
Mid-rise buildings in Woodbridge, Maple and Kleinburg sit between the two, often needing a focused update of builder-grade finishes, furniture and lighting. Whatever the building, we price clear options so the board can match scope to the reserve fund. Our condo lobby refurbishment guide explains how scope is set.
Newer Vaughan towers often have detailed building rules for contractors, covering insurance, elevator bookings, working hours and waste removal. We review those rules with management before the project starts and build them into the schedule, so the work follows the building's procedures from day one.
Parcel volumes in VMC towers can be very high. We size lockers or a parcel room to actual delivery numbers and plan courier access so it does not cross the lounge, which keeps the lobby calm even at peak times.
Woodbridge and Maple buildings often have a strong sense of community, with residents who have lived there for years. For these lobbies we favour warm, welcoming finishes, comfortable seating near the entrance and good lighting at the mailboxes, so the lobby feels like a shared living room rather than a corridor to the elevators.
Lobby projects often lead into corridor refurbishments, amenity refurbishments and furniture, fixtures and equipment. We can plan them together or in stages.

We work with condominium corporations throughout Vaughan.
Property managers with several buildings in the area can book one round of site reviews for all of them. We then prepare a separate scope for each corporation.
Yes. Our Vaughan work includes the lobby lounge at Park Terrace II on Townsgate Drive in Thornhill. Photos are on our projects page.
Often sooner than expected. Heavy traffic wears floors and furniture quickly, and many lobbies need a better parcel solution.
Yes. A feature ceiling, statement lighting, lighter finishes and new seating can transform a dated lobby.
We review contractor rules with management, provide insurance documents, book elevators and the loading dock in advance and follow the building's hours.
Yes. We work in zones with a clear route to the doors, elevators and mailroom.
Yes. We also refurbish corridors, so both can share one design and be scheduled together or in stages.
All of Vaughan, including the VMC, Thornhill, Woodbridge, Maple and Kleinburg. Call +1 (905) 581-1703.
Pricing depends on the size of the lobby, the finishes and furniture chosen, the concierge desk and the condition of existing floors, walls and ceilings. We price from a site review and give options so the scope fits your reserve fund.
Many lobby projects take a few weeks to a few months on site, plus design and ordering time beforehand. Custom furniture and desk millwork usually set the schedule, so we order them early. The board receives a written schedule before work starts.
Furniture and finishes in common areas must suit a public, exit-route space. We select contract-grade products with appropriate flammability testing and confirm requirements with your consultant. Our guide to fire-rated furniture in Ontario explains more.
Yes. As a design-build firm we handle finish and furniture selection, lighting design, renderings, pricing and construction with one team, which avoids gaps between designer and contractor.
Adding {{itemName}} to cart
Added {{itemName}} to cart