Collaboration, work enquires or just say helloholasalut你好もしもし안녕하세요
Missisauga
+1 (905) 581-1703
refurb@foliointeriors.com
Find Us
170 Ambassador Dr, Unit 3,
Mississauga, ON L5T 2H9
Missisauga
+1 (905) 581-1703
refurb@foliointeriors.com
Find Us
170 Ambassador Dr, Unit 3,
Mississauga, ON L5T 2H9

Lobby refurbishments for condominium buildings in Malton, in northeast Mississauga near Pearson Airport. We plan practical, durable lobby upgrades with your board and build them in stages.
Tell us about your Malton building and we will get in touch to arrange a site review.
Malton's high-rise buildings near Westwood Square and along Morning Star Drive mostly date from the 1970s and 1980s. Their lobbies handle a steady flow of families, tenants, visitors and deliveries, and after decades of use the flooring, lighting, furniture and security desk are usually ready for replacement.
Folio Interiors brings a practical, budget-aware approach to Malton lobby work. We focus spending on durable finishes and furniture that make the biggest visible difference, price the work clearly with options and keep the entrance open throughout.
Malton is part of Mississauga. See our Mississauga lobby refurbishment page for the rest of the city, our main condo lobby refurbishment service page for the GTA, or our corridor refurbishment in Malton page for hallways.

From the front doors to the elevator landing, we look after every part of the ground floor. Boards can take on the full scope or start with the items that are wearing out first.
We specify floors that stay safe when wet, resist salt and grit, and can be repaired in sections. A proper walk-off zone at the entrance protects both the lobby and the corridors beyond it.
Feature walls in stone-look porcelain, wood slats or textured wallcovering, new ceiling details and layered lighting that combines a statement fixture, cove lighting and sconces. Our guide to common area lighting retrofits covers the options and energy savings.
A new or rebuilt concierge desk with good sightlines and cable management, contract-grade lounge furniture, and a parcel and mailroom layout that keeps deliveries out of the main space. See our guide to concierge desk design.
We also look at how everything works together. Flooring, wall finishes, lighting, furniture and artwork should read as one design, so we present them on one finish board and in renderings rather than as separate decisions.
We order long-lead items such as the concierge desk, lighting fixtures and lounge furniture early, and store them until the space is ready, so residents are not left with an empty lobby for weeks.

Lobby finishes in Malton buildings balance appearance, durability and code. Every product, from flooring to upholstery, is checked against the requirements for common areas before it is ordered.
| Area | Common options | What to weigh |
|---|---|---|
| Floor | Porcelain tile, stone-look tile, luxury vinyl, walk-off matting | Slip resistance, winter salt, cleaning equipment, replacing damaged tiles |
| Walls | Stone-look porcelain, wood slats, textured wallcovering, paint | Impact from deliveries, feature wall location, acoustics, repairs |
| Lighting | Chandeliers or pendants, cove lighting, sconces, downlights | Light level at the desk, colour temperature, dimming, reaching fixtures for maintenance |
| Concierge desk | Custom millwork with quartz or stone top | Sightlines to doors and elevators, security screens, an accessible counter height |
| Furniture | Contract-grade lounge seating, tables, rugs | Flammability requirements, durability, cleanability, layout for traffic flow |
None of these means the building has been neglected. They are the normal result of years of daily traffic, and most can be resolved in one well-planned project.
Accessibility belongs in the same conversation. Power door operators, level thresholds, a lower section at the concierge counter and seating with arms make the lobby easier for everyone to use, and they are far simpler to add during a refurbishment than afterwards.
The main entrance has to stay open during a Malton lobby renovation, so we plan the work in zones. Residents always have a safe route in and out, and the concierge keeps working throughout.
The rules for the job are agreed in writing at the start: hours, temporary routes, notices and how the front desk will operate. Everyone works from the same plan until handover.
At the end of each stage, the supervisor walks the space with building staff, notes any touch-ups and confirms the area is ready before crews move to the next zone.

The sequence below is the same for a compact entrance or a two-storey atrium. Only the scale changes.
An on-site review of finishes, lighting, furniture, desk and access, with notes and measurements.
Design directions refined into one approved scheme with renderings and samples.
Itemized pricing with alternates so the board can match scope to funds.
Staged installation that keeps the entrance open and the lobby usable.
Final inspection with the board, deficiencies completed and spare stock handed over.
Cost and timing depend on the size of the lobby, the finishes and furniture chosen, the concierge desk and the condition of existing floors and ceilings. Boards often read our guides to common element refurbishment costs, reserve fund planning and the typical refurbishment timeline before asking for pricing.
Because lobby projects are usually paid from the reserve fund, we present the price in options: an essential scope, a recommended scope and any upgrades the board may want, so there are no surprises later.
Start with a short call or the form at the top of this page. We will visit, review the lobby and prepare a written plan with pricing options.
Call +1 (905) 581-1703 or email refurb@foliointeriors.com
You do not need a full specification to start. These details let us size the project and suggest realistic options.
We use the information to draft options before the site visit, which keeps the first meeting focused. See our cost guide for common elements for how boards usually stage upgrades.
A refurbished lobby changes how the building feels every day. Light is warm and even, seating is comfortable and the space finally looks cared for, which is what Malton owners expect from their common elements.
For management, the benefits are practical: fewer complaints, faster cleaning, better parcel handling and spare stock on hand when something is damaged. For owners, the lobby is the strongest first impression the building makes.
If you are also thinking about the elevators and accessibility, read our articles on elevator cab and lobby refurbishment and accessibility in condo common areas.
Busy Malton lobbies need finishes that resist damage and are easy to repair: slip-resistant porcelain at the entrance, impact-resistant wall finishes near the doors and elevators, and contract-grade furniture with wipeable upholstery. Bright LED lighting replaces dim, outdated fixtures and makes the space feel safer.
Where budgets are tight, we suggest a staged plan, starting with lighting, flooring and the desk and following with furniture and a feature wall, all from one approved design. Our condo lobby refurbishment guide explains the trade-offs.
Buildings close to the airport and the industrial areas around it see more dust and grit tracked in, especially in winter. We pay particular attention to the entrance, with recessed walk-off matting, flooring that hides soil between cleanings and a layout that keeps the cleaning routine simple for staff.
Security and parcel handling are common concerns. A redesigned desk with clear sightlines, better lighting at the doors and a controlled parcel area help staff manage the lobby and give residents more confidence in the building.
If the lobby is part of a bigger refresh, we also handle corridor refurbishments, amenity refurbishments and furniture, fixtures and equipment, so the finishes carry through the whole building.

We work with condominium corporations across Malton and the surrounding northeast Mississauga and Brampton area.
If your building is near one of these areas but not listed, we still want to hear from you. Site reviews are arranged around your property manager's schedule.
Yes. We stage the work, protect the space and keep the entrance, mailroom and elevators accessible at all times.
Usually lighting, entrance flooring and furniture. We price each item separately so the board can choose what to do first.
Recessed walk-off matting, flooring that hides grit and a simple cleaning plan agreed with staff keep the entrance looking good.
Yes. Better lighting, a desk with clear sightlines and a controlled parcel area help staff monitor who comes and goes.
Yes. We design the full lobby first, then stage the work to match the reserve fund.
Yes. Durable, easily repaired finishes and furniture suit buildings with frequent move-ins.
Yes. Lockers or a small parcel room keep deliveries off the floor and away from the desk, and give residents a secure way to collect packages.
Yes. Call +1 (905) 581-1703 or email refurb@foliointeriors.com to arrange a visit.
Pricing depends on the size of the lobby, the finishes and furniture chosen, the concierge desk and the condition of existing floors, walls and ceilings. We price from a site review and give options so the scope fits your reserve fund.
Yes. We work in zones, keep a safe route to the doors, elevators and mailroom, and set up a temporary concierge station when needed. Noisy work is limited to agreed hours.
It depends on the scope and on your declaration and by-laws. Like-for-like replacement of common elements is often treated differently from a substantial change, so boards should confirm with their condominium lawyer. We supply drawings, samples and pricing for any notice or owners' meeting.
Yes. As a design-build firm we handle finish and furniture selection, lighting design, renderings, pricing and construction with one team, which avoids gaps between designer and contractor.
Adding {{itemName}} to cart
Added {{itemName}} to cart