Collaboration, work enquires or just say helloholasalut你好もしもし안녕하세요
Missisauga
+1 (905) 581-1703
refurb@foliointeriors.com
Find Us
170 Ambassador Dr, Unit 3,
Mississauga, ON L5T 2H9
Missisauga
+1 (905) 581-1703
refurb@foliointeriors.com
Find Us
170 Ambassador Dr, Unit 3,
Mississauga, ON L5T 2H9

Lobby refurbishments for Richmond Hill condominiums along Yonge Street, around Richmond Hill Centre and in Bayview Hill and Oak Ridges. We design warm, durable lobbies and build them in stages.
Let us know about your Richmond Hill building and we will reply to set up a lobby review.
Richmond Hill's condominiums along Yonge Street, near Highway 7 and Langstaff and along Bayview Avenue and Leslie Street were mostly built from the late 1980s to the 2000s. Their lobbies often reflect that era, with polished brass, dark wood, heavy drapery and formal furniture. Owners who have lived there for years want a lobby that feels current and welcoming without losing its sense of quality.
Folio Interiors refurbishes Richmond Hill lobbies as one design-build project. We work with the board on finishes, furniture and renderings, prepare a clear scope and budget and complete the installation in stages so the entrance stays open.
For other York Region locations, see our main condo lobby refurbishment service page. For hallway work, see our corridor refurbishment in Richmond Hill.

A lobby refresh in Richmond Hill does not have to mean gutting the space. We review each element separately and recommend the mix that gives the strongest first impression for the budget.
Porcelain tile, luxury vinyl or stone-look surfaces are chosen for slip resistance, winter salt and the cleaning routine, with recessed walk-off matting at the doors to keep grit out of the rest of the building.
We choose wall finishes that stand up to deliveries and luggage, then layer the lighting so the lobby looks welcoming by day and night. For background, see our guide to common area lighting retrofits.
Desk millwork, lounge seating, artwork and parcel storage are planned together, so the lobby works for staff, residents and couriers. For more, read our guide to concierge desk design.
Not every lobby needs all of this. Some boards replace the floor and lighting and keep a good concierge desk; others focus on furniture and a feature wall. We explain the trade-offs so the scope reflects how the space is really used.
Because contract furniture and desk millwork can take several weeks to produce, we lock in those selections first and schedule construction around their delivery, so the finished space comes together at once.

The lobby is part of the building's exit route and a public-facing space, so finishes and furniture must meet fire safety requirements. We confirm product data with your consultant before ordering.
| Area | Common options | What to weigh |
|---|---|---|
| Floor | Large-format porcelain, LVT, recessed entrance mats | Wet-floor safety, grit and salt, maintenance routine, spare stock |
| Walls | Feature panels, wallcovering, millwork, paint | Durability at corners, focal point, sound absorption, cost over time |
| Ceiling | Drywall bulkheads, coves, coffers, acoustic panels | Height, sprinklers and detectors, access to services, light reflection |
| Lighting | Statement fixture, LED coves, wall sconces | Energy use, glare, warm versus cool light, emergency lighting requirements |
| Furniture and desk | Contract seating, millwork desk, parcel lockers | Fire safety of upholstery, staff workflow, delivery volumes, accessibility |
Spotting two or three of these is usually enough to start planning. A walkthrough helps us separate cosmetic wear from items that should be replaced.
Good lighting and contrast help residents with low vision, while sturdy seating with arms helps older residents rest while they wait. We build these details into the design so they look intentional, not like an afterthought.
Lobby work should not feel like a construction site. We split the job into stages, keep the entrance, elevators and mailroom accessible, and hand each area back clean before moving on.
Before mobilizing, we meet the property manager and board to agree on working hours, the temporary concierge setup and how deliveries will be handled. The plan is shared with residents in advance.
We also plan for the unexpected. If a resident needs assistance getting in or out, or a large delivery is booked, the supervisor adjusts the day's work so access is never a problem.

Our five-step process keeps Richmond Hill boards in control: you approve each stage before the next one starts.
We review the entrance, lobby, mailroom and concierge area, measure and photograph existing conditions.
Finish boards, furniture selections, lighting plans and 3D renderings show the finished lobby before approval.
A written scope and price with options, sized to your reserve fund.
Construction in zones with a temporary concierge, protection and daily cleaning.
A joint walkthrough, closed deficiency list and labelled spare materials.
For planning, our guides to common element refurbishment costs, reserve fund planning and the refurbishment timeline show how boards set budgets and schedules before requesting quotes.
Most boards fund lobby work from the reserve fund, so we tie each option to a clear price and timeline. If the full scope does not fit this year, we split it into stages that each leave the lobby looking finished.
Tell us about your building and share a few photos. We will arrange a site review, outline the choices and return a scope your board can act on.
Call +1 (905) 581-1703 or email refurb@foliointeriors.com
A few facts help us return a useful scope quickly. Rough numbers are fine; we confirm the details on site.
From there we prepare a first scope and ranged budget, then confirm quantities on site. Our cost guide for common elements explains how buildings phase common-area work.
The lobby is the first and last thing residents see every day. After a refurbishment it feels brighter, calmer and more secure, and residents are proud to welcome guests.
Staff notice the difference too: a desk that fits the way they work, a parcel system that keeps deliveries organised and finishes that are easy to clean. Buyers and tenants form their impression of the whole building here, so a fresh lobby supports resale and rental value.
The same design can continue upstairs. Our guides to elevator cab and lobby refurbishment and accessibility in condo common areas show how to carry the look and accessibility improvements beyond the ground floor.
Many Richmond Hill buildings are home to long-term owners, including older residents, so comfort and accessibility come first. We choose seating with arms at a comfortable height, light the lobby evenly without glare, keep flooring transitions flush and include an accessible section at the concierge counter.
Owners here often ask for a lobby that feels residential and refined rather than commercial. Our lobby at Park Terrace II in nearby Thornhill shows the approach: a coffered ceiling, a crystal chandelier, abstract artwork and soft grey seating that feel elegant but stay practical. Our condo lobby refurbishment guide explains how scope is matched to each building.
Towers near Yonge Street and Highway 7 see heavier traffic and more deliveries than older buildings further north. For these lobbies we add durable wall protection, slip-resistant entrance flooring and a parcel solution that keeps boxes out of the lounge.
Change can feel unsettling in a building with many long-term residents. Showing owners renderings and samples before work begins helps a great deal, and we are happy to attend an owners' information session with the board to walk through the design and the schedule.
Lobby projects often lead into corridor refurbishments, amenity refurbishments and furniture, fixtures and equipment. We can plan them together or in stages.

We work across Richmond Hill, from Langstaff to Oak Ridges.
Property managers with several buildings in the area can book one round of site reviews for all of them. We then prepare a separate scope for each corporation.
Yes. We balance current finishes with refined details such as a feature ceiling, a statement light fixture and quality furniture, as at Park Terrace II in Thornhill.
Seating with arms at a good height, even lighting without glare, flush flooring transitions and an accessible concierge counter all help.
Yes. We can present the design, samples and schedule with the board so owners understand what is planned.
Yes. We plan around heavier traffic and deliveries, with stronger finishes and a parcel solution where needed.
Yes. Where pieces are in good condition and suit the new design, we can reupholster, refinish or reuse them.
Yes. Our projects include Turnberry Court near Yonge and Finch and Park Terrace II in Thornhill.
All of Richmond Hill, including the Yonge Street corridor, Richmond Hill Centre, Bayview Hill and Oak Ridges. Call +1 (905) 581-1703.
Pricing depends on the size of the lobby, the finishes and furniture chosen, the concierge desk and the condition of existing floors, walls and ceilings. We price from a site review and give options so the scope fits your reserve fund.
Many lobby projects take a few weeks to a few months on site, plus design and ordering time beforehand. Custom furniture and desk millwork usually set the schedule, so we order them early. The board receives a written schedule before work starts.
Yes. We work in zones, keep a safe route to the doors, elevators and mailroom, and set up a temporary concierge station when needed. Noisy work is limited to agreed hours.
It depends on the scope and on your declaration and by-laws. Like-for-like replacement of common elements is often treated differently from a substantial change, so boards should confirm with their condominium lawyer. We supply drawings, samples and pricing for any notice or owners' meeting.
Adding {{itemName}} to cart
Added {{itemName}} to cart